COMMUNICATION PROJECTS

Commercial Building
Title: MA D.O.E. Office Building
Location: 75 Pleasant Street, Malden, MA
Client: CORJEN Builders, LLC
Description: Turning Mill Consultants, Inc. provided Category 6 and multimode fiber optic structured cabling systems design for the department's 130,000 square foot office building. Copper cabling system was awarded a 25-Year Mission Critical warranty under Hubbell and Mohawk cables Sure-Bit Warranty program. In addition the fiber optic backbone system was similarly warranted under Mohawk's SureLight program.

Construction included design of a 1,775 square foot data center and adjacent 500 square foot development and testing data center.



Main Server Room
Typical Telecommunications Room
Wireless Carrier Network
Title: MetroPCS New England
Location: Massachusetts
Client: MetroPCS
Description: Turning Mill Consultants, Inc. provided complete turnkey services from site acquisition, zoning, permiting, construction design and administration services, and in many instances, site construction for this, "New to New England", wireless carrier.

TMC along with the carrier's other site acq and A&E firms, were instrumental in providing MetroPCS with the roll-out of the largest new network in the Northeast, in the shortest amount of time.



Rooftop Install
Long Distance Microwave
Title: New Bedford to Cuttyhunk
Location: New Bedford, Massachusetts
Client: Verizon
Description: Turning Mill Consultants, Inc. designed, permitted and built two microwave sites. One in New Bedford (seen here) and one on Cuttyhunk Island.

The sites were built to provide backup long distance call traffic across Buzzard's Bay.

One of the sites location's, in the Historic District of downtown New Bedford, made it necessary to enclose the two six foot microwave antennas within a wireless friendly enclosure, built purposefully, to blend into the urban cityscape.



Microwave Antennas
Wireless Consealment
Customer Owned Outside Plant (CoOSP)
Title: Brown University - Peter Green House
Location: Olive Street, Providence, Rhode Island
Client: Wozny/Barbar and Associates, Inc.
Description: The relocation of Historic Peter Green House on the campus of Brown University required that all outside plant cabling run aerially along Olive Street be relocated underground. Turning Mill Consultants, Inc. working with the team members, helped design the underground infrastructure, which included conduit duct banks, a new maintenance hole, aerial transport across public streets and pathways through existing facilities. In all, the voice and data infrastructure for five separate buildings in two blocks were addressed.


Brown University - Peter Green House
Distributed Antenna System (DAS)
Title: Hull - DAS
Location: Hull, Massachusetts
Client: SpectraSite
Description:

TMC provided architectural, engineering design & permitting services as well as construction services.

Site required close attention due to flow-thru foundation requirements, which were tested against 20+ inches of rain.





Historic Renovation
Title: John D. Adams Courthouse
Location: Pemberton Square, Boston, Massachusetts
Client: CBT/Childs Bertman Tseckares, Inc.
Description: Provided dual service entrances, redundant backbone and CAT 5e SCS for voice and data. Spot locations received connections for video conferencing. Services were provided to the building's multiple court facilities.


John D. Adams Courthouse
Laboratory
Title: Brown University - Ecology & Environmental Biology
Location: Olive Street, Providence, Rhode Island
Client: Wozny/Barbar and Associates, Inc.
Description: Revised voice and data backbone location on 4th & 5th floors and made accommodations for similar revisions on all floors. Provided CAT 6 horizontal cabling for data and future VoIP applications.


Brown University - Laboratory
Resort
Title: Ocean Edge Resort
Location: Brewster, Massachusetts
Client: Ocean Edge Resort
Description: One of Cape Cod's most luxurious resorts requested the services of Turning Mill Consultants, Inc. to design its voice and data infrastructure in a planned expansion of "The Mansion". The 28,000 square foot addition would address the lack of space allocated for voice and data by making the Mansion's telecommunications room the voice and data hub for all of the resort's buildings east of Route 6A.

The Mansion
The Addition
Student Residence
Title: Wentworth Institute of Technology
Location: 555 Huntington Ave, Massachusetts
Client: Perkins & Will | Shaw
Description: Provided category 6 structured cabling system for voice and data with provisions for switching to VoIP in the near future. In addition CATV was distributed to all of the student apartments on each of seven levels.

Wentworth Institute of Technology
Universal Mobile Telecommunications Services
Title: Cingular Sites
Location: Throughout MA, MD, NJ, NY and PA
Client: Cingular Wireless, through its Applicants
Description: TMC provided engineering services for several hundred Cingular wireless sites in the New England and TriState area. Work included provisions for switching its equipment from analog to digital signaling as well as equipping each site with 3G and E911 equipment.